
Pag6
3.3 Assemblyofthebodies
Beforebeginningtheassemblyonsite,checkthatallelementsdeliveredinsidethebasinhavebeenremoved.Toaccessthebasin,the
boltsusedtocapturetheanglethatisusedtoholdthelouverspanelshavetobeeased.Thentheangleistoberem
oved,aswellas
somepanels.Theangletoberemovedislocatedintheadjacentsidewherethefloatingvalveisplaced.Seefig.6ae6b.
Fig.6a‐6b
Oncethelowerbodyhasbeeninstalled,theentireperimeteroftheasse mblyflangesmustbecleaned.Then,a rubbersealingga
sket
(supplied)willbeinstalledinordertoavoidanydampand/ordirt,just inthecentrelineoftheholesoftheflange.Ifthecoolingtower
hasaflangewithoutholes,thenadoublelineofsuperimposedgasketswillbeinstalled,asshowninfig.7,inord
ertoprotectthese
bodiesmorethoroughly.
Oncethegaskethasbeeninstalled,itisrecommendedtointroduceapointerintheholes,inordertoremoveanytracesofthegaskets
thatmightbeleftthere.
WHENASSEMBLINGBOTHBODIES,CHECKTHATBOTHPARTSOFTHEEXTERNALPIPEAREPLACEDONTHESAMESIDE,INORDERTO
FACILITATETHEINSTALLATION.
Komentarze do niniejszej Instrukcji