7.1.6 Coil
Thecoilhastobeobservedregularly.Ithastobeconsideredthatthisisakeyelementintheperformanceofthetower.
Therefore,duetothepossibilitiesofscaling,amonthlycheckisrecommendedandadailypurgeofpartofthesprayingwater.
7.
2 Intheairflowsystem
Theairflowsystemdoesnotrequireanyspecial attention,duetoitsstrength.Nevertheless,likeanyothermovingelementithastobe
regularlychecked,followingtheinstructionsbelow.
7.2.1 Motors
Motor maintenance is essentially limited to keeping winding and cooling ducts cl
ean, as well as attending bearings. If the
motorhasgrease‐lubricatedbearings,alsoperformthislubrication.
Thecasingtemperaturethatcanreachedapproximatelyto90or100°C,atemperaturethatthehandcannotresistmightlead
onetothinkthatthemotorisnotoperatingcorrectly.It is not necessary
, as was the custom in the past, to take the casing
temperatureastheonlyindicatortodeterminecorrectmotoroperation.
7.2.2 Fans
Amonthlyinspectionhastobecarriedout,inordertoremoveanypaper,leavesoranyoth erelementswhichcouldenterthe
impellers.
7.
3 Casingandwatercollectionbasinmaintenance
The tower has to be checked and cleaned twice at year at least. The basin needs cleaning periodically, since otherwise the drain
outlets,overflows,valvesandcirculationpumpswouldbecomeblocked.
We recommend draining and cleaning each month, or as often as necessary, in ac
cordance with the legislation in force, so as to
preventthebuild‐upofsediment.
Atleasttwiceayearthecasingwillbechecked,aswellascleaningthetowerexternalandinternally.
Ifanycorrosionisappreciated,proceedinthefollowingway:
1 Cleantheaffectedzonebymeansofasteelbrush.
2 Azinclay
erhastobeapplied
3 ApplyanAluminiumlayeroverthezinclayer.
7.4 Drifteliminator
Ageneralcleaningshouldbecarriedout twiceayearatleast,proceedingtoitssubstitutionifnecessary.